Sunshine Division: Difference between revisions
From hmis
Created page with "{{Facility |Has address=2145 NW Front Ave, Portland, OR 97209 |Has description=A 30,000+-square-foot facility featuring: A public food pantry, storage, administrative offices, loading docks for faster distribution, public transit access and parking |Has services=food, storage, office |Has character=Food |Has note=Renovations are set to begin in November 2025, with a projected move-in by spring 2026. McKenzie Architecture is leading the remodel design, and R&H Constructi..." |
No edit summary |
||
| (7 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
{{Facility | {{Facility | ||
|Has address=2145 NW Front Ave, Portland, OR 97209 | |Has address=2145 NW Front Ave, Portland, OR 97209 | ||
|Has description=A 30,000+-square-foot facility | |Has description=A 30,000+-square-foot facility for public food pantry, storage, administrative offices, loading docks, public transit access and parking | ||
|Has services=food, storage, office | |Has services=food, storage, office | ||
|Has provider=Sunshine Division, Inc. | |||
|URL=https://sunshinedivision.org/ | |||
|Phone=(503) 823-2131 | |||
|Email=jsingleton@sunshinedivision.org | |||
|Has funding=Community | |||
|Has character=Food | |Has character=Food | ||
|Has note=Renovations are set to begin in November 2025, with a projected move-in by spring 2026. McKenzie Architecture is leading the remodel design, and R&H Construction will serve as the project’s general contractor. | |Has note=Renovations are set to begin in November 2025, with a projected move-in by spring 2026. McKenzie Architecture is leading the remodel design, and R&H Construction will serve as the project’s general contractor. | ||
}} | }} | ||
Latest revision as of 22:47, September 19, 2025
Description: A 30,000+-square-foot facility for public food pantry, storage, administrative offices, loading docks, public transit access and parking
Services: food"food" is not in the list (Addiction, Address, Administration, Adoption, Advocacy, Animal, Behavioural, Business, Case, Child, ...) of allowed values for the "Has service" property., storage"storage" is not in the list (Addiction, Address, Administration, Adoption, Advocacy, Animal, Behavioural, Business, Case, Child, ...) of allowed values for the "Has service" property., office"office" is not in the list (Addiction, Address, Administration, Adoption, Advocacy, Animal, Behavioural, Business, Case, Child, ...) of allowed values for the "Has service" property.
Provider: Sunshine Division, Inc.
Funding: Community
Address: 2145 NW Front Ave, Portland, OR 97209
Notes: Renovations are set to begin in November 2025, with a projected move-in by spring 2026. McKenzie Architecture is leading the remodel design, and R&H Construction will serve as the project’s general contractor.
| Phone: (503) 823-2131 email: jsingleton@sunshinedivision.org URL: https://sunshinedivision.org/ |